Glass, Knife, Tweezer,,Plastic, PVD Vacuum Coating Machine [PVD] Physical Vapor Deposition: Vacuum deposition methods which can be used to deposit thin films and coatings.
Arc Discharge An electric arc or arc discharge is an electrical breakdown of a gas that produces an ongoing electrical discharge. The current through a normally nonconductive medium such as air produces a plasma; the plasma may produce visible light. An arc discharge is characterized by a lower voltage than a glow discharge, and it relies on thermionic emission of electrons from the electrodes supporting the arc.
Description Substrate Material: Glass, Metal (carbon steel, stainless steel, brass), Ceramics, Plastic, Jewelry. Recommend Machine: Multi Arc Ion Coating Machine Structure Type: Vertical structure, #304 Stainless Steel A. Coating Film: Multi-functional metal film, composite film, transparent conductive film, reflectance-increasing film, electromagnetic shielding film, decorative film B. Film Color: multi colors, gun black, titanium golden color, rose golden color, stainless steel color, purple color and other more colors C. Film type: TiN, CrN, ZrN, TiCN, TiCrN, TiNC, TiALN and DLC D.Consumables in production: Titanium, Chromium, Zirconium
Process
Application Decorative Film A. Glassware, such as glass cup, glass lamps, glass artworks B. Table wares, like metal forks and knives. C. Golf wares, like golf head, golf pole and golf balls. D. Sanitary Products/bathroom wares E. Door handles & locks F. Watches parts, like watch case and belt G. Metal jewelry H. Large size sheet, plate, pipe, tube and so on. Like large stainless steel plate and furnitures.
Advantages A. Fast to film forming, with high deposition speed B. Film with high Adhesive and high density C. Without any gas or liquid wasted D. Working stably with good vacuum performance E. Customized processing services
Configurations A. Pumps: mechanical pump + roots pump + diffusion pump + holding pump (or optional: cryogenic pump, cryogenic pump system) B. Gas System: 1~4 path C. Limited Vacuum: 6*10-4 pa (cleanroom, no-loading) D. Arc Source : 4-18sets (according to different machine size) E. Power Sources: DC power supply, Medium frequencypower supply, medium frequency power supply, heater supply, activation power supply, pulsed bias voltage power supply F. Targets: DC Magnetic Target, Medium Twin Target, Plane Target H. Gas Time : 5*10-4 pa, within 30mins I. Controlled by Manual, Semi-automatic, Full automatic, PLC
Customer visit
Shipment
Workshop
For more details on configurations quotations, please contact us.